Epicareer Might not Working Properly
Learn More

Technician Injection Molding

RM 2,100 - RM 2,600 / Per Mon

Apply on

Availability Status

This job is expected to be in high demand and may close soon. We’ll remove this job ad once it's closed.


Original
Simplified

Responsibilities:

  • Perform equipment setup, operation, equipment adjustments and minor preventive maintenance tasks to meet all standards for safety, quality and efficiency.
  • Operate machines and production equipment safely and in accordance with instructions.
  • Responsible on changing and setting of molds.
  • Ability to perform basic troubleshooting of extrusion blow molding equipment and support equipment when break downs occur and address minor problems and contact service support for major issues.
  • Servicing and maintaining machineries periodically and maintain record of setting for each product.
  • Assisting superior in monitoring quality of products from time to time.
  • Operate machines and production equipment safely and in accordance with instructions.
  • Respond to machine alarms in a timely manner to minimize down time and maintain machine efficiency.
  • Pays close attention to detail and housekeeping responsibilities to maintain a safe working environment at all times.
  • Optimize machine setting to minimize rejection.
  • Ensuring proper handling, maintaining and storage of all equipment.
  • Ensure machine is in tip top conditions to produce quality products.
  • To perform any others duties as assigned by Superior.

Requirement:

  • Candidates have a certificate / diploma in mechanical engineering from a recognized institution.
  • Candidates have knowledge and experience of plastic injection Blowing
  • Candidates must have a knowledge base for problem solving / technical injection skills

Interested candidates can call or WhatsApp: Azhar (012-523 2077)

Job Types: Full-time, Permanent

Pay: RM2,100.00 - RM2,600.00 per month

Benefits:

  • Free parking

Schedule:

  • Day shift
  • Night shift

Experience:

  • Injection Molding: 2 years (Required)
  • Plastic Manufacturing: 2 years (Required)